Hi,
we need to call a prebuilt (standard) connector where the the date range "start_date" is not at fixed distance from the "end_date".
For example : "Last Week" is different from "Last 7 days", ok?.
So, is there a way to call the connector not directly from the schedule, but from a program (a script) where I have set up the logic to define the date range?
I don't want to define a fully custom connector, but just wish to define only the interface to call the prebuilt connector.
Thanks.
Stefano G.