Our group recently upgraded to Workbench 5.
In previous versions of Workbench, there was an option to be able to schedule a job to run at a specific time. For example, Job 1 could be scheduled to start at the top of the hour, Job 2 to begin 10 minutes later, and so forth.
In Workbench 5, the option for scheduling is limited to the top of an hour only. Suggesions on how to be able to stagger the start time in specific increments? 